Open Access Building organizational resilience in public–private partnerships through adaptive risk sharing and governance under uncertainty

Main Article Content

Authors: Akua Sarpong
Authors: Yaw Asante
DOI: https://doi.org/10.5281/zenodo.22778627

Sarpong , A., & Asante, Y. (2026). Building organizational resilience in public–private partnerships through adaptive risk sharing and governance under uncertainty. Market Mechanisms Journal, 1(01), 81–96. https://doi.org/10.5281/zenodo.22778627

Abstract

This paper examines the relationship between risk sharing and organizational resilience in public–private partnerships (PPPs). Long-term PPP arrangements operate under substantial financial, operational, regulatory, political and demand uncertainty, making the distribution and management of risks a central condition of partnership sustainability. The paper argues that resilience cannot be achieved through contractual risk transfer alone. Instead, it depends on the alignment between risk responsibilities and the actual capacities of public and private partners, as well as on their ability to adapt when project conditions change. The analysis is structured around three dimensions: contractual architecture and risk-sharing mechanisms, governance and relational arrangements, and organizational and institutional adaptive capacities. The findings indicate that resilient PPPs combine appropriate risk allocation with flexible contracts, effective coordination, trust, institutional support, operational preparedness and access to complementary resources. Excessive or poorly calibrated risk transfer may increase financial pressure, conflict and renegotiation, whereas capability-based and adaptive risk sharing can strengthen project continuity. The paper therefore proposes an integrated understanding of PPP resilience in which contractual, organizational, relational and institutional mechanisms interact to preserve service delivery and partnership stability under uncertainty.

Article Details

References

1. Ait Hbibi, A., Makhrout, S., Errassaa, N., & El Hamidi, N. (2024). Digitalization of SMEs in Mo-rocco: Determinants of Business-to-Business (B2B) Fintech platform adoption. International Journal of Strategic Management and Economic Studies, 3(1), 501–513. doi: 10.5281/zenodo.13993299.

2. Barasa, E., Mbau, R., & Gilson, L. (2018). What is resilience and how can it be nurtured? A systematic review of empirical literature on organizational resilience. International Journal of Health Policy and Management, 7(6), 491–503. doi: 10.15171/ijhpm.2018.06.

3. Bracci, E., Tallaki, M., & Riso, V. (2024). Trust and management control archetypes in pub-lic-private partnerships. Journal of Accounting & Organizational Change, 20(6), 178–199. doi: 10.1108/JAOC-12-2023-0225.

4. Burke, R., & Demirag, I. (2019). Risk management by SPV partners in toll road public private partnerships. Public Management Review, 21(5), 711–731. doi: 10.1080/14719037.2018.1523450.

5. Caldwell, N. D., Roehrich, J. K., & George, G. (2017). Social value creation and relational coor-dination in public-private collaborations. Journal of Management Studies, 54(6), 906–928. doi: 10.1111/joms.12268.

6. Carpintero, S., & Petersen, O. H. (2016). Public–private partnerships (PPPs) in local services: Risk-sharing and private delivery of water services in Spain. Local Government Studies, 42(6), 958–979. doi: 10.1080/03003930.2016.1204297.

7. Casady, C. B., & Baxter, D. (2020). Pandemics, public-private partnerships (PPPs), and force majeure: COVID-19 expectations and implications. Construction Management and Economics, 38(12), 1077–1085. doi: 10.1080/01446193.2020.1817516.

8. Chou, J. S., & Pramudawardhani, D. (2015). Cross-country comparisons of key drivers, critical success factors and risk allocation for public–private partnership projects. International Jour-nal of Project Management, 33(5), 1136–1150. doi: 10.1016/j.ijproman.2014.12.003.

9. Chung, D., & Hensher, D. A. (2015). Risk management in public–private partnerships. Aus-tralian Accounting Review, 25(1), 13–27. doi: 10.1111/auar.12062.

10. Demirag, I., Khadaroo, I., & Stapleton, P. (2015). A changing market for PFI financing: Evi-dence from the financiers. Accounting Forum, 39(3), 188–200. doi: 10.1016/j.accfor.2015.05.001.

11. Duchek, S. (2020). Organizational resilience: A capability-based conceptualization. Business Research, 13(1), 215–246. doi: 10.1007/s40685-019-0085-7.

12. El Hamidi, N., & Karboub, Y. (2023). The impact of institutional quality on Morocco's macro-economic resilience to external shocks. International Journal of Economic Studies and Man-agement, 3(3), 766–779. doi: 10.5281/zenodo.7949020.

13. Eyerkaufer, M. L., Lima, F. G., & Gonçalves, M. B. (2016). Public and private partnership in disaster risk management. Jàmbá: Journal of Disaster Risk Studies, 8(1), Article 277, 1–10. doi: 10.4102/jamba.v8i1.277.

14. Fernandez, R. N., Saulo, H., Carraro, A., Tourrucôo, F., & Hillbrecht, R. (2018). Public-private partnership contractual design: A computational model of the moral hazard with lotteries. Public Organization Review, 18(1), 39–51. doi: 10.1007/s11115-016-0359-x.

15. Fleta-Asín, J., & Muñoz, F. (2020). How does risk transference to private partner impact on public-private partnerships' success? Empirical evidence from developing economies. So-cio-Economic Planning Sciences, 72, Article 100869. doi: 10.1016/j.seps.2020.100869.

16. Gabler, C. B., Richey, R. G., Jr., & Stewart, G. T. (2017). Disaster resilience through public–private short-term collaboration. Journal of Business Logistics, 38(2), 130–144. doi: 10.1111/jbl.12152.

17. Ghanem, M., & Ghaley, M. (2024). Building a framework for a resilience-based public private partnership. Journal of Destination Marketing & Management, 31, Article 100849. doi: 10.1016/j.jdmm.2023.100849.

18. Hodge, G. A., & Greve, C. (2017). On public–private partnership performance: A contempo-rary review. Public Works Management & Policy, 22(1), 55–78. doi: 10.1177/1087724X16657830.

19. Jung, K., & Song, M. (2015). Linking emergency management networks to disaster resilience: Bonding and bridging strategy in hierarchical or horizontal collaboration networks. Quality & Quantity, 49(4), 1465–1483. doi: 10.1007/s11135-014-0092-x.

20. Kate, G. S., & Patil, P. S. (2020). Risk analysis and allocation in public-private partnership power transmission line projects. International Journal of Critical Infrastructures, 16(1), 23–37. doi: 10.1504/IJCIS.2020.105404.

21. Kukah, A. S. K., Owusu-Manu, D. G., Badu, E., Edwards, D. J., & Asamoah, E. (2024). Fuzzy quantitative risk allocation model (FQRAM) to guide decision-making on risk allocation in Ghanaian public-private partnership (PPP) power projects. Journal of Financial Management of Property and Construction, 29(1), 83–114. doi: 10.1108/JFMPC-10-2022-0055.

22. Li, Y., Wang, X., & Wang, Y. (2017). Using bargaining game theory for risk allocation of pub-lic-private partnership projects: Insights from different alternating offer sequences of partic-ipants. Journal of Construction Engineering and Management, 143(3), Article 04016102. doi: 10.1061/(ASCE)CO.1943-7862.0001249.

23. Linnenluecke, M. K. (2017). Resilience in business and management research: A review of in-fluential publications and a research agenda. International Journal of Management Reviews, 19(1), 4–30. doi: 10.1111/ijmr.12076.

24. Liu, T., Bennon, M., Garvin, M. J., & Wang, S. (2017). Sharing the big risk: Assessment framework for revenue risk sharing mechanisms in transportation public-private partner-ships. Journal of Construction Engineering and Management, 143(12), Article 04017086. doi: 10.1061/(ASCE)CO.1943-7862.0001397.

25. Liu, Z., Wang, N., & Du, Q. (2025). The governance of PPP project resilience: A hybrid DE-MATEL-ISM approach. Systems, 13(4), Article 277. doi: 10.3390/systems13040277.

26. Ma, G., Du, Q., & Wang, K. (2018). A concession period and price determination model for PPP projects: Based on real options and risk allocation. Sustainability, 10(3), Article 706. doi: 10.3390/su10030706.

27. Mazher, K. M. (2025). Review of studies on risk allocation and sharing in public-private partnership projects for infrastructure delivery. Frontiers in Built Environment, 11, Article 1505891. doi: 10.3389/fbuil.2025.1505891.

28. Mazher, K. M., Chan, A. P. C., Zahoor, H., Ameyaw, E. E., Edwards, D. J., & Osei-Kyei, R. (2019). Modelling capability-based risk allocation in PPPs using fuzzy integral approach. Ca-nadian Journal of Civil Engineering, 46(9), 777–788. doi: 10.1139/cjce-2018-0373.

29. Mazher, K. M., Chan, A. P. C., Zahoor, H., Khan, M. I., & Ameyaw, E. E. (2018). Fuzzy inte-gral-based risk-assessment approach for public–private partnership infrastructure projects. Journal of Construction Engineering and Management, 144(12), Article 04018111. doi: 10.1061/(ASCE)CO.1943-7862.0001573.

30. Mhelembe, K., & Mafini, C. (2019). Modelling the link between supply chain risk, flexibility and performance in the public sector. South African Journal of Economic and Management Sciences, 22(1), 1–12. doi: 10.4102/sajems.v22i1.2368.

31. Nguyen, D. A., Garvin, M. J., & Gonzalez, E. E. (2018). Risk allocation in U.S. public-private partnership highway project contracts. Journal of Construction Engineering and Management, 144(5), Article 04018017. doi: 10.1061/(ASCE)CO.1943-7862.0001465.

32. Nur, S., Burton, B., & Bergmann, A. (2023). Evidence on optimal risk allocation models for Indonesian geothermal projects under PPP contracts. Utilities Policy, 81, Article 101511. doi: 10.1016/j.jup.2023.101511.

33. Opara, M. (2018). Value for money and risk relationships in public–private partnerships: Evaluating program-based evidence. Australian Accounting Review, 28(3), 391–404. doi: 10.1111/auar.12194.

34. Osei-Kyei, R., & Chan, A. P. C. (2015). Review of studies on the critical success factors for public–private partnership (PPP) projects from 1990 to 2013. International Journal of Pro-ject Management, 33(6), 1335–1346. doi: 10.1016/j.ijproman.2015.02.008.

35. Osei-Kyei, R., Jin, X., Nnaji, C., Akomea-Frimpong, I., & Wuni, I. Y. (2023). Review of risk management studies in public-private partnerships: A scientometric analysis. International Journal of Construction Management, 23(14), 2419–2430. doi: 10.1080/15623599.2022.2063013.

36. Pellegrino, R. (2021). Effects of public supports for mitigating revenue risk in public–private partnership projects: Model to choose among support alternatives. Journal of Construction Engineering and Management, 147(12), Article 04021167. doi: 10.1061/(ASCE)CO.1943-7862.0002098.

37. Rafaat, R., Osman, H., Georgy, M., & Elsaid, M. (2020). Preferred risk allocation in Egypt's water sector PPPs. International Journal of Construction Management, 20(6), 585–597. doi: 10.1080/15623599.2019.1703087.

38. Rybnicek, R., Plakolm, J., & Baumgartner, L. (2020). Risks in public–private partnerships: A systematic literature review of risk factors, their impact and risk mitigation strategies. Public Performance & Management Review, 43(5), 1174–1208. doi: 10.1080/15309576.2020.1741406.

39. Santandrea, M., Bailey, S., & Giorgino, M. (2016). Value for money in UK healthcare public–private partnerships: A fragility perspective. Public Policy and Administration, 31(3), 260–279. doi: 10.1177/0952076715618003.

40. Scala, B., & Lindsay, C. F. (2021). Supply chain resilience during pandemic disruption: Evi-dence from healthcare. Supply Chain Management: An International Journal, 26(6), 672–688. doi: 10.1108/SCM-09-2020-0434.

41. Shrestha, A., Chan, T. K., Aibinu, A. A., & Chen, C. (2017). Efficient risk transfer in PPP wastewater treatment projects. Utilities Policy, 48, 132–140. doi: 10.1016/j.jup.2017.03.003.

42. Shrestha, A., Chan, T. K., Aibinu, A. A., Chen, C., & Martek, I. (2018). Risk allocation ineffi-ciencies in Chinese PPP water projects. Journal of Construction Engineering and Management, 144(4), Article 04018013. doi: 10.1061/(ASCE)CO.1943-7862.0001457.

43. Soecipto, R. M., & Verhoest, K. (2018). Contract stability in European road infrastructure PPPs: How does governmental PPP support contribute to preventing contract renegotiation? Public Management Review, 20(8), 1145–1164. doi: 10.1080/14719037.2018.1428414.

44. Spieske, A., Gebhardt, M., Kopyto, M., & Birkel, H. (2022). Improving resilience of the healthcare supply chain in a pandemic: Evidence from Europe during the COVID-19 crisis. Journal of Purchasing and Supply Management, 28(5), Article 100748. doi: 10.1016/j.pursup.2022.100748.

45. Tallaki, M., & Bracci, E. (2021). Risk allocation, transfer and management in public–private partnership and private finance initiatives: A systematic literature review. International Journal of Public Sector Management, 34(7), 709–731. doi: 10.1108/IJPSM-06-2020-0161.

46. Torayashiki, T., & Watanabe, T. (2024). Factors contributing to the enhancement of feasibility in public–private partnership during disasters. Journal of Disaster Research, 19(3), 570–579. doi: 10.20965/jdr.2024.p0570.

47. Torchia, M., Calabrò, A., & Morner, M. (2015). Public–private partnerships in the health care sector: A systematic review of the literature. Public Management Review, 17(2), 236–261. doi: 10.1080/14719037.2013.792380.

48. Valipour, A., Yahaya, N., Md Noor, N., Mardani, A., & Antuchevičienė, J. (2016). A new hybrid fuzzy cybernetic analytic network process model to identify shared risks in PPP projects. In-ternational Journal of Strategic Property Management, 20(4), 409–426. doi: 10.3846/1648715X.2016.1210547.

49. Vecchi, V., Hellowell, M., della Croce, R., & Gatti, S. (2017). Government policies to enhance access to credit for infrastructure-based PPPs: An approach to classification and appraisal. Public Money & Management, 37(2), 133–140. doi: 10.1080/09540962.2016.1266173.

50. Wang, Y., Cui, P., & Liu, J. (2018). Analysis of the risk-sharing ratio in PPP projects based on government minimum revenue guarantees. International Journal of Project Management, 36(6), 899–909. doi: 10.1016/j.ijproman.2018.01.007.

51. Wibowo, A., & Sundermeier, M. (2020). Developing a fuzzy value-for-money analysis model for annuity-based public-private partnership infrastructure projects under consideration of risk mitigation capability. Journal of Construction Engineering and Management, 146(7), Ar-ticle 04020081. doi: 10.1061/(ASCE)CO.1943-7862.0001872.

52. Xiong, W., Chen, B., Wang, H., & Zhu, D. (2019). Governing public–private partnerships: A systematic review of case study literature. Australian Journal of Public Administration, 78(1), 95–112. doi: 10.1111/1467-8500.12343.

Similar Articles